action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /nas/content/live/rokkindustries/wp-includes/functions.php on line 6114Rokk Industries was contracted to supply and install new aeration diffuses to the SBR tank Number 1 at Jimboomba. Works included:
Replacing the lifting Ropes with 316 stainless steele and fabrication and installation of a new weir gate and seat. We found that the existing weir assembly had sustained severe electrolysis damage and was irreparable. As such a complete new gate was fabricated in house and the seat arrangement upgraded to a new design and fitted onsite.